Lagos Lagoon Enhancement
Project Overview
Removal of accumulated sediments in specific areas of the Lagos Lagoon, followed by site reclamation to support infrastructural development and create usable land.
Execution Process
- Site Assessment: Conducted extensive surveys to identify sediment accumulation and potential reclamation sites.
- Dredging Operations: Employed mechanical dredgers to remove sediments efficiently.
- Material Handling: Transported dredged materials to designated reclamation sites.
- Site Reclamation: Used the dredged materials to reclaim land, preparing it for infrastructural development.
Best Practices
- Strategic Planning: Planned dredging and reclamation activities to maximize efficiency and minimize disruptions.
- Quality Control: Maintained high standards of quality control to ensure the stability and suitability of reclaimed land.
- Stakeholder Collaboration: Worked closely with stakeholders to align project objectives and ensure successful outcomes.
Project Outcomes
- Lagoon Restoration Success: Successfully removed significant volumes of sediments, restoring the lagoon’s natural depth.
- Reclaimed Land Utilized: Reclaimed land was used for infrastructure projects, contributing to local development.
- Enhanced Water Quality: Improved water quality and ecosystem health in the dredged areas.
Building Excellence, Creating Value
Partner with COMBIC for innovative dredging and reclamation solutions that drive development and environmental sustainability. Contact us today to learn more about our comprehensive services.
Contact us
Email: hello@combicltd.com
Mobile: +234 805 803 2832, +234 915 540 6805
Address: Plot 10, Block 70, Taiye Olowu Street, Lekki Phase 1, Lagos State | 10, Arigidi Street, Bodija, Ibadan, Oyo State
